Devanning Completed

MOTOR 13.2T

We executed a seamless live devanning operation, unloading incoming cargo directly from a shipping container and immediately transferring it onto a waiting flatbed trailer.

Variable (UK, depending on delivery routes) 13.5MT 1 Day - Single Shift

Project Overview

A high-efficiency project involving the immediate unloading of a sea container and simultaneous loading onto a flatbed trailer.

  • Highlights:
    • Zero-storage solution to reduce handling costs and transit time.
    • Expert use of reach stacker and lifting tools for damage-free cargo extraction.
    • Strict adherence to flatbed safety regulations and securement standards

Challenge · Solution · Result

Challenge

The customer was faced with an importing vessel delay and a strict delivery deadline, our team stepped in to mitigate a potential logistics crisis. The collection and delivery window was shortened due to the port’s late release of the container. The goods needed an immediate transfer to the customer’s pre-booked trailer.

Solution

Despite the shortened window caused by the port’s late release of the container, we executed a rapid collection response and a live devan. By coordinating the immediate transfer of goods to the customer’s pre-booked trailer.

Result

Our team managed the rapid extraction of goods while the driver remained on-site, ensuring zero downtime. The cargo was then strategically loaded onto a flatbed with precision weight distribution—maintaining the 60/40 front-to-back balance—and secured using industrial-grade tensioning straps for safe transit.